20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier

1,673

  • [Stable Performance] — High quality electrolytic capacitors with stable performance.
  • [Specification] — Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ±20%; Operating temperature: 105; Dissipation Factor:
  • [Durable &Long Life] — Heat resisting, low leakage, low loss and low impedance.
  • [Ideal Choice] — Great choice for electronic professionals or enthusiasts.
  • [WIde Used] — Suitable for a wide range of electronic applications.

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Features: High quality electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its surface, convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: <0.24 at 20℃/120Hz Dimensions: 16 x 27mm / 0.63 x 1.06inch Lead type length: Tin plating  copper layer Lead length: 38mm / 1.5inch Type: Polarized Quantity: 20pcs Weight: Approx. 79gPackage Included: 20 x Electrolytic Capacitor

Additional information

Weight 0.07 kg
brand

Vikye

dimensions


:

8 x 7 x 6 cm; 70 Grams