addition to your collection.
This has a useful extra long lead rope with a brass swivel trigger clip.
Ideal for when distance is needed.
Length: 3m.
Additional information
Weight | 0.35 kg |
---|---|
Brand | Shires |
EAN | 5051771737027 |
addition to your collection.
This has a useful extra long lead rope with a brass swivel trigger clip.
Ideal for when distance is needed.
Length: 3m.
Weight | 0.35 kg |
---|---|
Brand | Shires |
EAN | 5051771737027 |