TECHGEAR USB C to Lightning Cable [2M Apple MFi Certified] Strong Nylon Braided Long Lead for iPhone 12/11/ Pro/Mini/X/XS/XR/Max /8/ Plus, iPad 10.2″ 2020 Support Power Delivery for Type C Chargers

$38.99

  • Make sure this fits by entering your model number.
  • Apple MFi: MFi certification and strict quality testing ensure your Apple devices are charged at their full potential safely, at maximum speed at a secure and stable voltage.
  • Power Delivery: Use together with an 18W or higher USB-C Power Delivery adapter (including Apple 29W, 30W, 61W, or 87W USB-C Power Adapter) to charge your compatible iPhone to 50% in just 30 minutes. Meaning a charge speed that is almost twice as fast as using a standard charger and cable. (Please ensure your iPhone/iPad supports PD charging to take advantage of the fast charge)
  • Long Life: Lasts 30× longer than ordinary cables and able to withstand 30000 bends. The nylon braided cable prevents unexpected scratches, damage and is tangle free
  • Fast Data Transfer: It offers data sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds.
  • Widely Compatible: This cable supports PD Fast Charge 3A (max) for iPad Pro 10.5″, iPad Air 3rd Gen 10.5″, iPad Mini 5th Gen, iPad 7th / 8th Gen 2020 10.2″, and iPhone 12, 12 Pro, 12 Mini, 12 Pro Max, 11, 11 Pro, 11 Pro Max, XS Max, XS, XR, X, 8, 8 Plus and newer devices. It support the standard charge (5V/2.4A max) for iPhone 6 6s 7 8 / Plus. (Only iPhone 8 and the newer iPhones support PD fast charge). Works with DJI Mavic Air 2 Drone Remote Controller USB C to Apple Lightning iPhones / iPads

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Brief:
Sturdy braided nylon envelops a bulletproof fiber core, ensuring a lifespan thirty times longer than other cables. With full support for high-speed Power Delivery Charging, it’s the only cable you’ll ever need to buy.
This TECHGEAR USB cable is designed to connect your iPhones and iPad to USB C equipped chargers for charging. This quality cable also allows to connect to USB C port on your laptop or desktop, in order to charge and exchange / sync data simultaneously. The nylon braided cable prevents unexpected scratches and damage.
Power Delivered
Works flawlessly with the USB-C Power Delivery high-speed charging protocol. Delivers a high-speed charge up to 3A (max) with the USB-C PD charger, to charge e.g. an iPhone X from 0% to 50% in 30 mins.
Fast Data Transfer
It offers data to sync up to 480Mbps, transfer music, movie, files between iPhone and USB-C laptops in seconds.
Broad Compatibility
Supports PD Fast Charge 3A (max) for iPad Pro 12.9″ 2015 / 2017, iPad Pro 10.5″, iPad Air 3rd Gen. 10.5″, iPad Mini 5th Gen. 7.9″, iPad 10.2″ 8th Gen 2020 and iPhone 12, 12 Pro, 12 Mini, 12 Pro Max, 11, 11 Pro, 11 Pro Max, XS Max, XS, XR, X, 8 Plus, 8, and more devices with lightning port.
MFi Certified
Certified to work with any device that uses a Lightning connector.
Extra Long Length
Longer size lets you use your device with convenience. This cable is longer than normal cables so you can leave it plugged in at hard to reach sockets and charge your device whilst using it. At 2m long, this is the perfect cable for your plug n play needs.
Technical specifications
Connector: USB Type C to Lightning
Cable Length: 2M / 6.5ft
Data Transfer Rate: upto 5 Gbps
Power: upto 3A.
Colour: Silver

Additional information

Weight 0.02 kg
brand

TECHGEAR

dimensions


:

17 x 8.6 x 2.2 cm; 20 Grams