Specifications: Material: polyester film Quantity: 10pcs Voltage: 630V Capacitance: 0.022uF Diameter: 5.7mm/0.22in Capacitor Body Length: 15.3mm/0.6in Weight: Approx. 9g Package Included: 10 x Axial Polyester Film Capacitors Note: 1. Due to the difference between the monitors and light effect, the picture may not reflect the actual color of the item. 2. Please allow small deviation due to manual measurement. Thanks for your understanding.
10Pcs Axial Polyester Film Capacitor Mylar Polyester Film Capacitor Assortment Kit with Long Lead 0.022uF 630V for Radio Amplifier
€21.99
- Stable Property: High quality polyester film capacitors with stable performance.
- Specification: Voltage: 630V, Capacitance: 0.022uF, Diameter: 5.7mm/0.22in , Capacitor Body Length: 15.3mm/0.6in.
- Easy to Use: Lightweight with simple structure, easy to use.
- Application: Suitable for old radios and tube amplifiers.
- Good Choice: Great choice for electronic professionals or enthusiasts.
In stock
Additional information
Weight | 0.02 kg |
---|---|
brand | Garosa |
dimensions | |