25M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

8,278

  • Make sure this fits by entering your model number.
  • [25 METER HDMI CABLE] – High-Speed HDMI to HDMI 1.4a Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. NOT SUITABLE for 4K 2160p resolutions at 60Hz.
  • [QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring pure copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or office. With a durable PVC jacket for easy routing in challenging areas
  • [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Virgin Media HD and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Freesat, Freeview, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when resolution in set higher than 1080p.
  • [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • [PREMIUM SERVICE] – Our cables have a 2-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service. In the unlikely event there is a problem then don’t hesitate to contact us, and we will be happy to make things right

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 1.49 kg
brand

True HQ