3M USB Cable A Male To A Male Plug Shielded 28awg Long Lead (Black)

81.99

  • Make sure this fits by entering your model number.
  • Designed to connect USB devices such as external hard drives / cameras / modems / printers / keyboards / mice enclosures etc to your PC, Mac, computers, laptops, tablets and other USB Peripherals
  • Providing Hi-Speed USB 2.0 480 megabit per second data transfer rates makes it easier to transfer files between them
  • Connectors: 4pin USB Type A-male to 4pin USB Type A-male
  • Make plug-and-play connections for such devices as docking stations, MP3 Players and other USB Peripherals. NO driver need
  • Extra-long cable. Lengths: 3M

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Specification:USB 2.0 is the most popular way to connect a wide variety of devices such as external hard drives to computers, laptops and other USB PeripheralsFeatures:- USB A Male to USB A Male Connectors- USB 2.0 Standard. 480 megabit per second data transfer rates- Plug and play connections. NO driver need- Lengths: 3MPlease Note:- This cable is NOT intended to connect two computers together- Does NOT support connecting a USB hub between two computers

Additional information

Weight 0.13 kg
brand

HOHT