Accod Pet/Dog Training Leash (5M Nylon Dog Lead Dog Long Lead Rope with 360 Degree Rotating Stainless Steel Hook for Small Medium and Large Dog(Black)

¥3,994

  • Size:5M long and 2.5cm wide.
  • Material:Made of strong nylon and durable metal hook,Strong and wear resistant,Keep your dog under control.
  • Metal hook for easy attachment to your dog’s own collar,Rotate 360 degrees without entangle,Make your dog play safer,Suitable for outdoor walking training recall and running.
  • 5M Long Training Lead Leash:Suitable length nylon training rope,Holding the leash soft nylon handle,You can choose the right length you want for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.
  • Suitable for all kinds of large, medium and small dogs,Strong nylon leash allow you and your dog to enjoy the outdoor.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Accod 5M long dog training lead leash made of strong nylon and durable metal hook,Rotate 360 degrees without entangle,Metal hook for easy attachment to your dog’s own collar,Keep your dog under control. Suitable for all kinds of large, medium and small dogs. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming. Let you and your dog get close to nature, feel the fun of the outdooructs Include: Accod 5M Dog Nylon Training Rope x 1Service: We are committed to providing quality products and services to our customers. If you have any questions, please let us know by email or you are not satisfied with our products. You can return them to us will refund your money.

Additional information

Weight 0.1 kg
brand

Accod

dimensions

‎11.2 x 8.9 x 3.2 cm; 100 Grams