AWAVM Dog Slip Lead 6ft, Figure of 8 Dog Lead,Anti-pull Dog Training Leash Rope Lead with Durable padded 2 Handles 6FT/182cm Adjustable Dog long Lead for Small, Medium and Large Dogs (BLACK)

2,641

  • High quality material: Our dog leash is made of high-quality climbing nylon rope, with a unique high-density anti bite layer design inside. The strength is almost twice that of similar ropes! Lightweight and sturdy, suitable for towing small, medium, and large dogs.
  • Adjustable slip ring: The rope dog chain design has an adjustable stopper, suitable for any size of neck. AWAVM provides high-power dog anti slip traction ropes. When the dog pulls, the training rope will tighten; When the dog’s behavior is corrected, the training rope will loosen.
  • High reflective surface: A prominent reflective line has been added to the anti pull traction rope, which can be seen by vehicles at night, making it both safe and eye-catching for walking or jogging at night, providing safety protection.
  • Padded handle and perfect length: We have added a soft and sturdy EVA pad to the handle, making it comfortable to control your dog and protecting your hands from rope burns.
  • Super Soft Neck Ring: The AWAVM strong anti slip collar features an ultra soft collar that provides strong neck safety protection for your dog. The rope type dog leash allows your dog to move freely under your control. This dog rope tractor is specially designed to combine the collar and traction rope, making it easy to apply to dogs of various neck sizes. No additional collar or strap required.

In stock

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

cription

/

Directions

No

Additional information

Weight 0.17 kg
Brand

AWAVM