Axial Polyester Film Capacitor-10Pcs Axial Polyester Film Capacitor with Long Lead 0.022uF 630V for Radio Amplifier

¥3,402

  • ✔【Stable Performance】High quality polyester film capacitors with stable performance
  • ✔【Specification】Voltage: 630V,Capacitance: 0.022uF,Diameter: 5.7mm/0.22in,Capacitor Body Length: 15.3mm/0.6in,Weight: Approx. 9g
  • ✔【Easy to Use】Lightweight with simple structure
  • ✔【Great choice】10PCS sufficient quantity,Great choice for electronic professionals or enthusiasts
  • ✔【Suitable for Tube Amplifiers Ect】Suitable for old radios and tube amplifiers

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

 
Specifications:
Material: polyester film
Quantity: 10pcs
Voltage: 630V
Capacitance: 0.022uF
Diameter: 5.7mm/0.22in
Capacitor Body Length: 15.3mm/0.6in
Weight: Approx. 9g
 
Package Included:
10 x Axial Polyester Film Capacitors
 
Note:
1. Due to the difference between the monitors and light effect, the picture may not reflect  the actual color of the item.
2. Please allow small deviation due to manual measurement. Thanks for your understanding.

Additional information

Weight 0.01 kg
brand

Regun

dimensions

8 x 7 x 6 cm; 10 Grams