COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $44.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.11 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $44.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.12 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $44.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.11 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $50.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.23 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $46.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.16 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $50.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.25 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $46.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.18 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $46.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.15 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $50.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.21 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $50.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.23 kg
Brand

COMSLE

COMSLE Long Leads for Dog Training, 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle, Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor

AUD $44.99

  • More Choices: Width: 2cmthere are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
  • Nylon Ttraining Lead: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog’s freedom, and is not elastic, allowing you and your dog to walk or run within a good distance.
  • Extra Freedom: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports.
  • Metal Rotating Buckle: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360 and can be easily fixed to the dog’s collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook.
  • Widely Usable: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.12 kg
Brand

COMSLE