Dog Training Lead, 10M/32FT Waterproof Strong Dog Leads, 360° Rotating Buckle Long Lead Leash with Padded Handle for Large, Medium and Small Pet Dog(Black)

£33.99

  • STURDY & DURABLE: Our strong dog lead is made of high quality PVC, zinc alloy buckle and nylon webbing. It can withstand up to 200 kg of tension, suitable for large, medium and small dog. Great for camping hiking swimming and other activities
  • WATERPROOF & EASY TO CLEAN: Coated the nylon webbing with high quality PVC material. The dog training lead leash will not absorb water on rainy days and able to hold flexibility in cold weather. It’s easy to clean and dirt-resistant. Our waterproof lead is of good weather resistant texture, which is soft to the touch, not harsh
  • LONG DOG LEAD: The 10 meters long lead is used for helping to train the re-call of your dog without it running off. Or just walk the dog in a field and without having to worry about it running away
  • 360° ROTATING ALLOY BUCKLE : Swivel buckle prevents the leash from twisting and dog getting tangled, allowing your dog to run freely and you to get a good control of your dogs
  • ANTI-SLIP & PADDED HANDLE: This long training leash features soft padded handle for extra comfort. It provides you with firm grip and max safety, protects your hand from rubbing. Suitable for long walking.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.53 kg
brand

Vivifying

dimensions

‎26.4 x 20.4 x 5.2 cm; 540 Grams