Dog Training Lead Leash 2Pack, 10m/32ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Red)

132.99

  • 【Delivery:】2Pack of dog leads
  • 【Leash Size:】10M/32Feet*2CM
  • 【Well made Training Leash:】It’s made of strong nylon with durable metal Buckle, the 29 cm D-ring cushioned handle is firm comfortable hold, works well if you want to tie if off or clip it to your waist, Suitable for trainers.
  • 【Swivel-style Stainless Steel Buckle:】The dog lead comes with a Swivel-style Buckle for easy to attach to your dog¡¯s collar, rotated by 360 degree secure your pet to play in any way safely.
  • 【Long Lead:】 The 10meters/32Feet long dog lead is used for train the re-call of your dog, Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.38 kg
brand

Luchai

dimensions

‎1000 x 2 x 0.2 cm; 380 Grams