Double Ended Lead for Dogs, RUNEAY Double Dog Lead 3m Adjustable Double Clip Lead for Dogs, 3m Long Lead Dog Lead Dog Rope for Small Medium Large Dogs

NZD $65.99

  • HIGH QUALITY DOG LEAD: Tightly woven from strong nylon, RUNEAY double ended lead for dogs is lightweight, bite-resistant, strong, stable, tear-resistant, and safe
  • HEAVY DUTY D-SHAPED HOOK: RUNEAY double ended lead for dogs comes with 2 heavy duty D-shaped hook. The 7.5cm big D-shaped hook very strong and is not easy to break
  • ADJUSTABLE DOUBLE ENDED LEAD FOR DOGS: RUNEAY 3m double ended dog lead have 3 O-rings and 2 heavy duty hooks. You can adjust different lengths into 100 cm, 150 cm, 200 cm, 250 cm or the full length 300cm
  • WONDERFUL DOG LEAD FOR WALK: RUNEAY double clip dog lead is a perfect outdoor dog training lead for walking, jogging, running, camping and hiking. Perfect equipment for outdoor activities at home, in the park or on the beach
  • LONG LEAD FOR DIFFERENT SIZES DOGS: RUNEAY double ended lead for dogs is suitable for small medium and large dogs, such as Bulldog, Chihuahua, Pug, Jack Russell Terrier, Maltese, Dachshund, Mongolian, Beagle, Yorkshire Terrier, Shih Tzu, Pomeranian, Poodle, Cocker Spaniel, etc.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.36 kg
Brand

RUNEAY