EAHOME Dog Training Lead Long Rope Cotton Nylon Webbing Recall Obedience Line Leash for Pet Long Lead For Large, Medium and Small Dogs – Great for Training, Play, Camping, or Backyard(5M)

HKD216.05

  • 【Size】Width:2.5cm. Available in different length,3m, 5m, 8m, 10m, 15m, 20m. Tested to over 100Kg pull force Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • 【High Quality】Made from strong nylon, Quality durable metal hook. Easy to wear and remove,Help you take your dog easily
  • 【New Design】Trigger hook for easy attachment to your dog’s own collar, rotated by 360 degree allows your pet to play more secure. Allows you to teach your dog recalls and other obedience skills
  • 【Suitable For】Teddy, Chihuahua, Miniature pinscher, Schnauzer, Samo, Husky, Golden Retriever, German Shepherd , Rottweiler , Alaska , Tibetan mastiff and other pets
  • 【Package】1 x Rope dog lead

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Specification Material: Durable nylon + metal hook Width:2.5cm Color:BlackPackage Included 1 * Long Dog Training Lead Hope that our products can bring your pet a healthy and happy life. please e-mail us, if you have any problem or suggestions with our products, we will serve you wholeheartedly.

Additional information

Weight 0.141 kg
brand

EAHOME

dimensions

18.8 x 12.7 x 3.5 cm