Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105 Dissipation Factor: <0.24 at 20/120Hz Dimensions: 16 x 27mm / 0.63 x 1.06inch Lead type length: Tin plating copper layer Lead length: 38mm / 1.5inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor
Electrolytic Capacitor, 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, 20Pcs
₪88.99
- 【High Performance】High quality electrolytic capacitors with stable performance
- 【Convenient to Use】The specifications of the capacitors is marked on its surface, convenient to use
- 【Heating Resistant】Heat resisting, low leakage, low loss and low impedance
- 【User】Great choice for electronic professionals or enthusiasts
- 【Application】Suitable for a wide range of electronic applications
In stock
Additional information
Weight | 0.06 kg |
---|---|
brand | Garosa |
dimensions | 8 x 7 x 6 cm; 60 Grams |