Eyeleaf Training Leads for Dogs – Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M/16ft)

AUD $30.99

  • 【Dimension Approx】Width:2.5cm; Available in six size, 50m/165ft, 30m/100ft, 20m/65ft, 15m/50ft, 10m/30ft, 5m/16ft; Our extra long lead has the length needed to allow them to wander and ensure your command to come.
  • 【Well made Training Leash】It’s made of strong nylon with durable metal Buckle. This long dog training leash is durable and heavy duty, easy to wear and remove.
  • 【Comfortable Design】The dog leash with a foam padded handle that is super comfortable while dogs pulling,and protects your hand.
  • 【Multi-Functional Use】Our dog training leash allows a dog to run free and teach your dog recalls and other obedience skills, yet remain under control if walking in a public place great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.
  • 【100% Service & Guarantee】: We are happy to provide full satisfaction with our Dog leash. 30 days product replacement or refund if you are not satisfied. Contact us at first time if not satisfiedk you so much.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.12 kg
brand

Eyeleaf

dimensions

‎16.8 x 14.3 x 5.5 cm; 120 Grams