Fanshiontide Dog Training Lead Leash, 10m/33ft Long Lead For Large, Medium and Small Dogs, Long Dog Recall Lead, Recall Obedience Line Leash for Pet (Black)

£13.99

  • 【Leash Size】10M/33Feet*2CM. Our extra long lead has the length needed to allow them to wander and ensure your command to come.
  • 【Durable Training Lead】This durable polypropylene dog training leash will outlast nylon leashes. All stitching is reinforced and the metal buckle made of zinc alloy is high quality and durable.
  • 【Swivel-style Zinc Alloy Buckle】The dog lead comes with a Swivel-style Buckle for easy to attach to your dog’s collar, rotated by 360 degree secure your pet to play in any way safely.
  • 【Long Lead】This training leash is great for teaching your dog recalls. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play or swimming.
  • 【Widely applicable】Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Features: – 100% brand new and high quality polypropylene material. The PP dog leash can be used in any weather without damaging it. The dog leash will not stretch or deform. – Trigger hook for easy attachment to your dog’s own collar, rotated by 360 degree allows your pet dogs to play more secure. Allows you to teach your dog recalls and other obedience skills. – The lead is suitable for most of the pets! Specifications: Length: 10m/33ft Width: 2cm/0.8 inch Material: polypropylene Package:1 * Long Dog Leash Note: When using the leash, please hold the handle instead of the rope, otherwise, the dog may run suddenly and hurt your hand. Be careful! There is a needle to fix the dog leash, it is easy to find, please pay attention when disassembling.

Additional information

Weight 0.16 kg
brand

Fanshiontide

dimensions

‎16.3 x 15.8 x 4.5 cm; 155 Grams