HAPPY HACHI Dog Training Lead, 15m/50ft Dog Long Lead Line Rope Reflective Nylon Recall Obedience Leash for Pet(Black)

¥7,693

  • ◢LONG LEASH FOR DIFFERENT TYPE DOGS 0.8cm diameter, length:5m/16ft,10m/33ft,15m/49ft, 4 sizes fit for different training purposes and perfect dog control. The extended belt is perfect for hiking, camping, training, hunting, backyard, beach, recall training, swimming and other activities! The length is sufficient to track the movement of the pet in sight and prevent the pet from getting lost
  • ◢DURABLE CLIMING ROPE The lead is made of special braided nylon, the orange nylon rope is firmly woven on the outside of the rope, which is wear-resistant and bite-resistant. The inner core of the rope is a thick white nylon rope, which has strong load-bearing capacity. Both ends of the rope are equipped with metal spring buckles that can rotate 360° to prevent tangles and kinks
  • ◢EXCELLENT DESIGN Our long leashes have reflective stripes to ensure the safety of pets. It can reflect ambient light in extreme low light conditions and can even track pet activity at night. When you are tired of walking/training/playing, you can wrap the belt around a wooden pile or tree to free your hands and let your pet move freely
  • ◢LIGHTWEIGHT & EYE-CATCHING It is light and soft. After many tests, the weight of the belt is very light, and it can float on the water without sinking. Pets can swim on a leash, which will not affect their activities. Bright orange can even easily track the activities of pets on the water, and you can easily find pets in the woods, bushes, backyards and other places
  • ◢PERFECT FOR PET BEHAVIOR TRAINING This long recall leash is suitable for training your dog to act from their memories. And it can training the puppy to focus on you, also allowing she/he to run agilely without getting out of your sight or control. To train it and make it follow your instructions to stop and recall

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.54 kg
brand

HAPPY HACHI

dimensions

‎29.5 x 18.4 x 8.2 cm; 500 Grams