Herm Sprenger Rubberised Nylon Long Lead Neon Green Reflective (200cm)

422.00

  • The Herm Sprenger rubberised long lead is constructed of neon green nylon woven through with a hard wearing black rubber thread and a reflective stripe for visibility in low light conditions.
  • The resulting lead ensures the grip on the handle is reassuring and secure even in wet or muddy conditions.
  • With a generoud 17cm/6.5″ handle.
  • The rubberised nylon lead measures 19mm wide and a choice of either 120cm/47″ or 200cm/79″

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

The Herm Sprenger rubberised tracking lead is constructed of neon pink nylon woven through with a hard wearing black rubber thread and a reflective stripe for visibility in low light conditions. The resulting lead ensures the grip on the lead is reassuring and secure even in wet or muddy conditions. The rubberised nylon lead measures 19mm wide and a choice of either 120cm/47″ or 200cm/79″ with a 17cm/6.5″ handle.

Additional information

Weight 0.1 kg
brand

LuvMyDog Worldwide / Herm Sprenger

dimensions

‎12.7 x 11.43 x 0.76 cm; 100 Grams