HuaDmaing Leather Dog Lead Long Line Dog Lead Long Leads for Dog Training Slip Lead for Dogs Leather Belt Safety Traction Rope for Medium Large Dogs Walking (6.5-ft Brown)

¥7,317

  • Quality MaterialOur pet leash is made of high-quality Iron and steel synthesis and leather, strong and durable, soft and smooth, wear-resistant and not easy to break. gentle on your dog’s skin and your hands. Your leather leash will not become a knotty mess like nylon leashes.
  • Easy To UseOur leather training lead leash adopts a rotating lobster clasp design, which can be easily fixed to your dog’s own collar,Improved alloy iron/copper 360 degree swivel clasp will resist rust and corrosion for decades. which is very convenient to use.
  • ApplicationOur leather training lead leash is very suitable for pets to use when going for a walk. It can effectively control pets running around and prevent pets from being lost. Won’t collect hair like a nylon leash, a smart choice for walking, training or running with pets. Classic woven trim, super durable belt. Classic woven trim, super durable belt.
  • Perfect SizeOur pet dog leash has a width of 0.5 Inch and a length of 6.5ft, which is the most practical pet leash size. can give plenty of space for you and your dog to enjoy a free and safe walking in open area.
  • Unique DesignThe handle position of our pet leash adopts a simple knitted pattern style, which can make it look more fashionable and exquisite.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Product description

Introducing our premium Leather Dog Leash, the ideal companion for your pet’s daily walks and training sessions. Constructed with high-quality iron and leather, this leash is not only strong and durable but also soft and smooth to the touch, ensuring comfort for both you and your pet. Its 0.5-inch width and 6.5-foot length provide the perfect balance of control and freedom, suitable for pets of various sizes. The leash’s unique knitted pattern handle adds a touch of elegance and style, while the rotating lobster clasp ensures easy attachment to your dog’s collar, offering convenience and reliability. Additionally, our leather leash is designed to resist water and avoid collecting hair, making it a practical choice for any weather and environment. Experience worry-free strength, durability, and a premium feel with our leather dog leash, backed by a full one-year customer-friendly product warranty. Whether for walking, training, or running, this leash is a durable and stylish choice for your pet’s outdoor activities.

Directions

no

Additional information

Weight 0.13 kg
Brand

NICE01