Joytale Training Leads for Dogs, Padded Handle Long Line Dog Lead, 5m 10m 15m 20m Long Leads for Dog Training and Tie Out, Support Up to Dogs Under 45kg, Blue 15M

AUD $80.99

  • PADDED HANDLE – The grip of this long line dog leash is neoprene padded which is soft and it can get your hand away from burning while training or playing
  • SEPARABLE DESIGN FOR MUTIL PURPOSE – With handle, this leash is an ideal dog training leash; To remove the handle it is a good tie out cable for camping or backyard
  • HEAVY DUTY CLIPS – Both the hooks of the long lead leash for dog training is made of alloy steel and its rust resistant and durable
  • PREMUIM CLIMBING ROPE – This long leash for dog training is created by sturdy climbing rope. This material is strong and abrasion resistant, making it an excellent material for training leash for dogs that pull
  • NO TANGLE – Both of the snap of this extra long leash for dogs outside is swivel-style, which is twisted resistant

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.7 kg
Brand

Joytale

EAN

6976939760237