KFD DC 15V Power Supply Charger for Marshall Stockwell 4091451 Portable Bluetooth Speaker 15V 1.8A Advent AW870 ADV-W801 Wireless Speaker Power Adapter Cable 1.8M long Lead Transformer home wall PSU

AUD $81.99

  • Make sure this fits by entering your model number.
  • Input:World Wide Input Voltage AC :100-240VAC 50/60Hz; DC Output: 15V 1.8A | CE, ROHS, TUV, UL,GS,REACH certified
  • Output DC 14V~16V Compatible
  • Compatible : Marshall Stockwell Portable Bluetooth Speaker 4091451 04091451
  • Advent AW870 Wireless Powered Speakers Wireless Speakers
  • Please confirm the specifications and plug size before purchasing!If you can’t make sure,pls feel free to contact us,Package content:1x UK AC Adapter, 30 days free exchange, One year Warranty

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Additional information

Weight 0.14 kg
brand

Brand: KFD

dimensions