Perfect for anyone wanting to use fairy lights indoor and outdoor. Perfect for creating the special magical atmosphere for parties. Can be used as wedding table decorations, festive lighting for your home, gifts for Christmas & party centre pieces. Safer and Easier to use. 8 Different Sparking Modes with Memory Function (change to the next mode by pressing the control button once): 1. Combination 2. In Waves 3. Sequential 4. Slo-Glo 5. Chasing / Flash 6. Slow Fade 7. Twinkle / Flash 8. Static On Works with UK standard plug. Energy-saving and long operating life Power Source:Main Cable Colour:White Light Length:4m/6m/8m/20m No. Of Lights:120,300,400 or 800 Bulb Type:LED Brand:LightsGo The Creative Fairy Lights Expert!
LightsGo Waterproof Blue and White Icicle Christmas Fairy Lights 800 Lights 20 Metres Wide Plus Long Lead Cable – Safe Voltage (800 Lights 20M) [Energy Class A+++]
HKD1,408.97
- Make sure this fits by entering your model number.
- 800 LED Lights 20 Metres of Lights (width) Plus 10 Metres Extension Lead Cable (plug to the first light).
- 8 Sparking Modes with Memory Function. It Will Remember Your Last setting. The default mode is Static.
- Low Voltage Kids Pets Safe Design. The System is 31V and only 4Watt. Even When the Wire is Broken, It Is Still Safe to Pets and Human. It’s So Important if You Have Naughty Children Around.
- Massive 10 Metre or 33 Feet Lead Cable. It’s Enough For Most Homes. LED Powered, Low Power Consumption.
- LightsGo branded. Proper Made! CE Passed. Weatherproof, Can Be Used Indoor and Outdoor. Your Safety is Our Priority!
In stock
Additional information
Weight | 1.685 kg |
---|---|
brand | LightsGo |
dimensions | 27.7 x 23 x 17.4 cm; 1.68 Kilograms |