Shires Extra Long Lead Rope 440, Navy, 3m

NZD $50.99

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

addition to your collection.
This has a useful extra long lead rope with a brass swivel trigger clip.
Ideal for when distance is needed.
Length: 3m.

Additional information

Weight 0.35 kg
Brand

Shires

EAN

5051771737027