0.47uF 470nF Axial Capacitor Metallised Polypropylene Film 630V Rated 5% Tolerance with Long Lead for Radio Amplifier Pack of 20

33.99

  • 20Pcs axial capacitors, for old radios audios and tube amplifiers.
  • 470nF capacitance; 0 V to 630 V operating voltage; ±5 % tolerance.
  • 21x13mm body size, the lead length is about 40mm.
  • Metallised polypropylene film, with stable performance.
  • Lightweight with simple structure, easy to use.

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Item Descriptions:-20Pcs axial capacitors, for old radios audios and tube amplifiers.-470nF capacitance; 0 V to 630 V operating voltage; ±5 % tolerance.-21x13mm body size, the lead length is about 40mm.-Metallised polypropylene film, with stable performance.-Lightweight with simple structure, easy to use.-A great choice for electronic professionals or enthusiastsage:20x 470nF Axial Metallised Polypropylene Film Capacitor(Note: Other accessories are not include.)Item Specifications:Type:Film CapacitorConstruction:Metallised Polypropylene FilmTermination Style:AxialMinimum Operating Voltage:0 VMaximum Operating Voltage:630 VTolerance Rating:±5 %Capacitance Rating:470 nF

Additional information

Weight 0.109 kg
brand

The Lord of the Tools

dimensions


:

15.9 x 14.4 x 1.9 cm; 109 Grams