Item Descriptions:-20Pcs axial capacitors, for old radios audios and tube amplifiers.-470nF capacitance; 0 V to 630 V operating voltage; ±5 % tolerance.-21x13mm body size, the lead length is about 40mm.-Metallised polypropylene film, with stable performance.-Lightweight with simple structure, easy to use.-A great choice for electronic professionals or enthusiastsage:20x 470nF Axial Metallised Polypropylene Film Capacitor(Note: Other accessories are not include.)Item Specifications:Type:Film CapacitorConstruction:Metallised Polypropylene FilmTermination Style:AxialMinimum Operating Voltage:0 VMaximum Operating Voltage:630 VTolerance Rating:±5 %Capacitance Rating:470 nF
0.47uF 470nF Axial Capacitor Metallised Polypropylene Film 630V Rated 5% Tolerance with Long Lead for Radio Amplifier Pack of 20
HKD304.15
- 20Pcs axial capacitors, for old radios audios and tube amplifiers.
- 470nF capacitance; 0 V to 630 V operating voltage; ±5 % tolerance.
- 21x13mm body size, the lead length is about 40mm.
- Metallised polypropylene film, with stable performance.
- Lightweight with simple structure, easy to use.
In stock
Additional information
Weight | 0.109 kg |
---|---|
brand | The Lord of the Tools |
dimensions | |