Dog Training Lead Leash, 15m/50ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Green)

¥4,928

  • Obedience and Recall Training Lead
  • 2.5cm (1″) wide, 15m (50 ft) long
  • Choice of 6 colours
  • D Ring sewn into handle allowing length to reduce by 50%
  • Manufactured from strong woven Nylon

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

This offer is for a 15m (50 feet) long dog lead in choice of 6 different colours, with D ring sewn into handle allowing size to be reduced by 50% if required. Features: Metal snap hook which swivels to allow easy connection to collar. Metal D ring. Strong nylon material 1” wide. Choice of 6 attractive colours. Size: 50’ x 1” (15m x 25mm) Packing: Will arrive in poly bag attached to card. Sizes: Please note all sizes are approximate and allow for manufacturing tolerances.

Additional information

Weight 0.32 kg
Brand

Easipet

EAN

5060164218562