This offer is for a 15m (50 feet) long dog lead in choice of 6 different colours, with D ring sewn into handle allowing size to be reduced by 50% if required. Features: Metal snap hook which swivels to allow easy connection to collar. Metal D ring. Strong nylon material 1” wide. Choice of 6 attractive colours. Size: 50’ x 1” (15m x 25mm) Packing: Will arrive in poly bag attached to card. Sizes: Please note all sizes are approximate and allow for manufacturing tolerances.
Dog Training Lead Leash, 15m/50ft Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience (Green)
NZD $55.99
- Obedience and Recall Training Lead
- 2.5cm (1″) wide, 15m (50 ft) long
- Choice of 6 colours
- D Ring sewn into handle allowing length to reduce by 50%
- Manufactured from strong woven Nylon
In stock
Additional information
Weight | 0.32 kg |
---|---|
Brand | Easipet |
EAN | 5060164218562 |