Hot devices feed or connection cable with safety plug, 1.5 m lead wire and warm Socket 175 °. Highly durable by cable cross-section of 1.0 mm². Suitable for most laboratory devices. Maximum load 16 A @ 220 V WS.
Neolab 1 2034 1.5 Meter 1.5 M Extra Long Lead Straight Cable – White
AUD $70.99
- Warm devices feed or connection cable with safety plug, 1.5 M LEAD WIRE AND WARM Steckdose 175 °
- High strong thanks to the cable cross-section of 1.0 mm²
- Suitable for most labor devices
- Maximum load 16 amp @ 220 Volt WS
- Colour: White
In stock