Neolab 1 2034 1.5 Meter 1.5 M Extra Long Lead Straight Cable – White

CAD $62.99

  • Warm devices feed or connection cable with safety plug, 1.5 M LEAD WIRE AND WARM Steckdose 175 °
  • High strong thanks to the cable cross-section of 1.0 mm²
  • Suitable for most labor devices
  • Maximum load 16 amp @ 220 Volt WS
  • Colour: White

In stock

— OR  —

— OR  —

  • International Express shipping available
  • 30 day easy returns
Guaranteed Safe Checkout

Hot devices feed or connection cable with safety plug, 1.5 m lead wire and warm Socket 175 °. Highly durable by cable cross-section of 1.0 mm². Suitable for most laboratory devices. Maximum load 16 A @ 220 V WS.

Additional information

Weight 0.16 kg
brand

neoLab